

Kingsford Charcoal
Project OverviewProject Overview
Location
Summer Shade, Kentucky
Client Industry
Industrial
Size
23,500 Square Feet
Project Description
Scott, Murphy & Daniel performed work within the existing facility on various miscellaneous renovations. Design and construction of an office space with renovation of existing breakroom and toilet areas was the first step. The next step was the design and construction of a 1,500-gallon septic tank system with 2,800 liner feet of force main. Exterior site work for this project included excavation and fill with liner raw material storage, construction of retaining wall 150 liner feet x 20’ – 0” tall for off-loading station at raw materials.