Kingsford Charcoal

Project Overview

Project Overview

Location

Summer Shade, Kentucky

Client Industry

Industrial

Size

23,500 Square Feet

Project Description

Scott, Murphy & Daniel performed work within the existing facility on various miscellaneous renovations. Design and construction of an office space with renovation of existing breakroom and toilet areas was the first step. The next step was the design and construction of a 1,500-gallon septic tank system with 2,800 liner feet of force main. Exterior site work for this project included excavation and fill with liner raw material storage, construction of retaining wall 150 liner feet x 20’ – 0” tall for off-loading station at raw materials.

Gallery